Flow shops with machine maintenance: Ordered and proportionate cases
Document Type
Article
Publication Date
11-16-2010
Abstract
We consider the m-machine ordered flow shop scheduling problem with machines subject to maintenance and with the makespan as objective. It is assumed that the maintenances are scheduled in advance and that the jobs are resumable. We consider permutation schedules and show that the problem is strongly NP-hard; it remains NP-hard in the ordinary sense even in the case of a single maintenance. We show that if the first (last) machine is the slowest and if maintenances occur only on the first (last) machine, then sequencing the jobs in the LPT (SPT) order yields an optimal schedule for the m-machine problem. As a special case of the ordered flow shop, we focus on the proportionate flow shop where the processing times of any given job on all the machines are identical. We prove that the proportionate flow shop problem with two maintenance periods is NP-hard, while the problem with a single maintenance period can be solved in polynomial time. Furthermore, we show that the optimal algorithm for the single maintenance case is a frac(3, 2)-approximation algorithm for the two maintenance case. In our conclusion we discuss also the computational complexity of other objective functions. © 2010 Elsevier B.V. All rights reserved.
Identifier
77953870363 (Scopus)
Publication Title
European Journal of Operational Research
External Full Text Location
https://doi.org/10.1016/j.ejor.2010.04.018
ISSN
03772217
First Page
97
Last Page
104
Issue
1
Volume
207
Recommended Citation
Choi, Byung Cheon; Lee, Kangbok; Leung, Joseph Y.T.; and Pinedo, Michael L., "Flow shops with machine maintenance: Ordered and proportionate cases" (2010). Faculty Publications. 6008.
https://digitalcommons.njit.edu/fac_pubs/6008
