"Integrated Distributed Production and Distribution Problem for Minimiz" by Yushuang Hou, Yaping Fu et al.
 

Integrated Distributed Production and Distribution Problem for Minimizing Earliness and Tardiness Penalty

Document Type

Conference Proceeding

Publication Date

1-1-2021

Abstract

Production and distribution play essential roles in a supply chain. How to integrate them for overall high performance has become an important problem in academia and industry. This work proposes an intelligent optimization method to solve an Integrated Distributed Production and Distribution problem with Time-windows (IDPDT). We need to assign the jobs among flow shops and deliver the products by vehicles to customers within required time windows. Accordingly, a mathematical programming model is built to minimize total weighted earliness and tardiness and an improved brainstorm optimization algorithm is developed by fully considering problem characteristics. Through a comparison with a memetic algorithm, the experiment results indicate that the developed approach is effective in handling the investigated problem.

Identifier

85126659389 (Scopus)

ISBN

[9781665440486]

Publication Title

Icnsc 2021 18th IEEE International Conference on Networking Sensing and Control Industry 4 0 and AI

External Full Text Location

https://doi.org/10.1109/ICNSC52481.2021.9702229

Grant

2020RWG011

Fund Ref

National Natural Science Foundation of China

This document is currently not available here.

Share

COinS