Assessment of the economic feasibility of robotic assembly while conveyor tracking (RACT)
Document Type
Article
Publication Date
1-1-1989
Abstract
This paper is the third in a series of publications by Abdel-Malek (1986, InlernationalJournal of Production Research, 24, 1025-1041) and Abdel-Malek and Boucher (1985, International Journal of Production Research, 23, 197-208). It extends the previous work to cover the concept of robotic assembly while conveyor tracking (RACT). Analytical models are developed to aid the application engineers to depict the effect of RACT implementation on the assembly process throughput. The models also help in assessing the susceptibility of the RACT concept to the different design parameters and its economic feasibility. © 1989 Taylor & Francis Group, LLC.
Identifier
0024701634 (Scopus)
Publication Title
International Journal of Production Research
External Full Text Location
https://doi.org/10.1080/00207548908942618
e-ISSN
1366588X
ISSN
00207543
First Page
1209
Last Page
1224
Issue
7
Volume
27
Recommended Citation
Abdel-Malek, Layek L., "Assessment of the economic feasibility of robotic assembly while conveyor tracking (RACT)" (1989). Faculty Publications. 20782.
https://digitalcommons.njit.edu/fac_pubs/20782
