A note on scheduling parallel machines subject to breakdown and repair
Document Type
Article
Publication Date
2-1-2004
Abstract
In this paper we consider n jobs and a number of machines in parallel. The machines are identical and subject to breakdown and repair. The number may therefore vary over time and is at time t equal to m(t). Preemptions are allowed. We consider three objectives, namely, the total completion time, Σ Cj, the makespan Cmax, and the maximum lateness Lmax. We study the conditions on m(t) under which various rules minimize the objective functions under consideration. We analyze cases when the jobs have deadlines to meet and when the jobs are subject to precedence constraints. © 2003 Wiley Periodicals, Inc.
Identifier
1142293230 (Scopus)
Publication Title
Naval Research Logistics
External Full Text Location
https://doi.org/10.1002/nav.10105
ISSN
0894069X
First Page
60
Last Page
71
Issue
1
Volume
51
Recommended Citation
Leung, Joseph Y.T. and Pinedo, Michael, "A note on scheduling parallel machines subject to breakdown and repair" (2004). Faculty Publications. 20458.
https://digitalcommons.njit.edu/fac_pubs/20458