Issues on short-term scheduling of oil refinery

Document Type

Conference Proceeding

Publication Date

1-1-2006

Abstract

In practice, the short-term scheduling job of oil refinery processes is still done manually by planners, because of the lack of such tools. This paper briefly reviews the theoretic research advancement in this field. It shows that although some progress has been made, the techniques obtained are not applicable in practice. Thus, the future research trends in this field should focus on methods that can bridge the gap between theory and applications. Based on the review, this paper concludes that it may be helpful if the problem is studied in a viewpoint of control theory and hence, solved by combining enumeration and heuristic instead of using mathematical programming formulations. © 2006 IEEE.

Identifier

34548134110 (Scopus)

ISBN

[1424401003, 9781424401000]

Publication Title

Conference Proceedings IEEE International Conference on Systems Man and Cybernetics

External Full Text Location

https://doi.org/10.1109/ICSMC.2006.384561

ISSN

1062922X

First Page

2920

Last Page

2925

Volume

4

This document is currently not available here.

Share

COinS