Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel

Document Type

Article

Publication Date

6-1-2006

Abstract

We consider the problem of scheduling orders on identical machines in parallel. Each order consists of one or more individual jobs. A job that belongs to an order can be processed by any one of the machines. Multiple machines can process the jobs of an order concurrently. No setup is required if a machine switches over from one job to another. Each order is released at time zero and has a positive weight. Preemptions are not allowed. The completion time of an order is the time at which all jobs of that order have been completed. The objective is to minimize the total weighted completion time of the orders. The problem is NP-hard for any fixed number (> 2) of machines. Because of this, we focus our attention on two classes of heuristics, which we refer to as sequential two-phase heuristics and dynamic two-phase heuristics. We perform a worst case analysis as well as an empirical analysis of nine heuristics. Our analyses enable us to rank these heuristics according to their effectiveness, taking solution quality as well as running time into account. © 2006 Wiley Periodicals, Inc.

Identifier

33646260457 (Scopus)

Publication Title

Naval Research Logistics

External Full Text Location

https://doi.org/10.1002/nav.20138

e-ISSN

15206750

ISSN

0894069X

First Page

243

Last Page

260

Issue

4

Volume

53