Bi-criteria scheduling with machine assignment costs
Document Type
Article
Publication Date
9-1-2012
Abstract
We consider parallel machine scheduling problems where the processing of the jobs on the machines involves two types of costs. The first type of cost is similar to one of two classical objective functions that are often considered in scheduling theory; it is either the total completion time or the makespan. The second type of cost involves an actual cost associated with the processing of a specific job on a given machine. Each job-machine combination may have a different cost. The optimization problems considered may be structured in several different ways. We consider first the two objectives hierarchically; that is, first one objective is being optimized and the class of optimal solutions is determined, and then the second objective is optimized among all schedules that are optimal with respect to the first objective. Another structure that is considered involves the minimization of a linear combination of the two objective functions. We present an overview of the computational complexities of all the problems considered in our framework. © 2010 Elsevier B.V. All rights reserved.
Identifier
84863228331 (Scopus)
Publication Title
International Journal of Production Economics
External Full Text Location
https://doi.org/10.1016/j.ijpe.2012.05.016
ISSN
09255273
First Page
321
Last Page
329
Issue
1
Volume
139
Recommended Citation
Leung, Joseph Y.T.; Lee, Kangbok; and Pinedo, Michael L., "Bi-criteria scheduling with machine assignment costs" (2012). Faculty Publications. 18126.
https://digitalcommons.njit.edu/fac_pubs/18126
